County Road 98

Cr 98 --2

County Road 98 Bike and Safety Improvement Project, Phase II

Yolo County is in the planning and design stage of the County Road (CR) 98 Bike and Safety Improvement Project, Phase II project.

The project will extend the following improvements southward from the first phase of the CR 98 project, completed in 2014.  The project will begin approximately 1300 feet south of CR 29 and extend 4.1 miles southward to the Solano County Line.   A preliminary description of the project improvements are described below:

  • Add eight-foot paved shoulders for bike lanes and an additional twelve-foot clear recovery zone along the entire length of both sides of this existing narrow two lane arterial road.
  • Close the gap between the existing Class 1 bike path on Russell Blvd and the Class 2 bike lanes on Hutchison Drive on the University of California campus. This gap will be closed with a Class 1 bike lane.
  • Install roundabouts at the intersections with County Road 31, CR 32, and Hutchison Drive. The intersections of CR 98 with CR 31 and CR 32 are currently controlled with four-way stop signs.
  • Relocate drainage ditches and utility poles outside the clear recovery zone.
  • Provide mitigation for environmental impacts of project.

The project has currently received federal funding for preliminary engineering, right of way and construction. 

Current Project News:

Monument ROW Inc. has began to present the offers to property owners to acquire the permanent and temporary easements required for the project.

Pattison & Associated performed appraisal site visits in March 2023 and April 2023 and produced appraisal reports for each property.

Mark Thomas & Company staked the right of way need in late February 2023 early March 2023.

Monument ROW, Inc. was hired to perform all of the right of way acquisition for the project.  In Mid-February 2023 Monument ROW, Inc mailed the Notice of Decision to appraise to all property owners. 

Authorization to being the right of way phase was received December 2022.

Intersection Control Evaluation (ICE) Report


Final initial Study Mitigated Negative Declaration August 2021 Recirculation

 

Past Project News:

February 12, 2020 County Road 98 Bike & Safety Improvement Project Open House

December 11, 2018

Board of Supervisors approved the recommendation to proceed with design and environmental for roundabouts at the intersection fo CR 98 with Hutchison Drive, CR 32 (Russell Boulevard) and CR 31 (Covell Boulevard).

October 17, 2018 Public Meeting

Staff's recommendation for roundabouts at the major intersections will be presented to the Board of Supervisors on December 11, 2018.  A contract is being prepared with a consultant to prepare the environmental documents for this project is underway.  A consultant will be on board to begin the environmental review for the project by January 2019. 

October 17, 2018 presentation

September 5, 2018 Public Meeting

At the September 5, 2018 public meeting at the Unitarian Universalist Church of Davis, Social Hall, Ross Ainsworth of GHD presented an overview of the project goals, pros and cons of intersection types, and the process that will be used to determine staff's recommendation to the Board of Supervisors regarding intersection type.  Preliminary layouts of the two intersection types at all three major intersections with CR 98 (CR 31, CR 32, and Hutchison Drive) were on display for members of the public to make comments and raise concerns about the project and layouts.  Staff from GHD and the County listened to concerns and answered questions about the project.

February 7, 2017 Public Meeting

At the February 7, 2017 public meeting at the Unitarian Universalist Church of Davis, Social Hall, Ross Ainsworth of Omni-Means presented a power point regarding project goals and pros and cons of the intersection alternatives of traffic signals and roundabouts at the major intersections in the corridor.  Aerial pictures of the corridor as well as blown-up pictures of the intersections of CR 98 with Hutchison, CR 32, and CR 31 were on display for members of the public to make comments and concerns about the existing intersections and what improvements they would like to see.  Staff from Omni-Means and the County listened to concerns and answered questions about the project.

Transcripts of the comments and meeting presentations are posted here:

Slides from September 5, 2018 public meeting

September 5, 2018 meeting comments

February 7, 2017 Intersection comments

February 7, 2017 Corridor comments

February 7, 2017 All comments categorized by topic

The power point presentation is posted:

February 7, 2017 power point

Some additional typical sections are posted:

February 7, 2017 typical sections

March 2, 2016 Public Meeting

At the March 2, 2016 public meeting at the Unitarian Universalist Church of Davis, Social Hall, the County displayed plans showing the existing road and areas beyond the existing road, as well as plans of potential typical cross sections of the new road.  Members of the public were invited to make comments and concerns about the existing roads and what improvements they would like to see.

Potential typical sections are posted here:

March 2, 2016

Written comments received at and following this meeting are posted here: 

March 2, 2016

April 2, 2015 Roundabout Demo for State Highway 16 & County Road 89 intersection in Madison

 

Questions about the project should be directed to Lilia Razo at lilia.razo@yolocounty.org